On the map
State significant development

CleanEra Mt Thorley Waste Facility

Expanding the CleanEra waste facility at Mount Thorley

Under way: at prepare eisWasteNeighbourhood scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

Expanding the CleanEra waste facility at Mount Thorley

CleanEra proposes to expand its existing waste treatment and recycling facility at 45 Maskey Road, Mount Thorley, in the Singleton Shire. The facility now processes up to 5,000 tonnes a year. The proposal would raise this to 200,000 tonnes a year: 175,000 tonnes of non-dangerous solid and liquid waste and up to 25,000 tonnes of dangerous goods waste. Equipment would be reconfigured within existing buildings, and it would keep operating 24 hours a day, 7 days a week. No capital investment or job numbers are stated.

The proponent lodged a scoping report to request the Secretary's environmental assessment requirements (SEARs), and the SEARs have been issued. The case is now at the stage where the proponent prepares an environmental impact statement (EIS). Next, the EIS is to be exhibited and the public can make submissions. There are no submissions yet. The department then assesses the project and decides it.

Proposed annual waste throughput
200,000 tonnes a yearScoping Report
Non-dangerous waste
175,000 tonnes a yearScoping Report
Dangerous goods waste
25,000 tonnes a yearScoping Report
Current approved throughput
5,000 tonnes a yearScoping Report

The department's description

Expansion of existing 24/7 waste facility processing up to 175,000 tpa of liquid and solid wastes and 25,000 tpa of liquid hazardous waste. Refit of equipment within existing buildings to enable increased waste processing and dangerous goods handling

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.