On the map
State significant development

Clean Energy Precinct - Infrastructure & Ammonia

A 30,000 tonne ammonia tank and works at Kooragang

Under way: at prepare eisIndustry and warehousesNeighbourhood scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report - Infrastructure & Ammonia DA on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 30,000 tonne ammonia tank and works at Kooragang

The proponent proposes infrastructure and ammonia storage at 20 Cormorant Road, Kooragang, in the City of Newcastle area. It includes a 30,000 tonne ammonia storage tank, electrical and water infrastructure, administration and warehouse buildings, internal roads and a car park. The work would disturb up to 32.5 ha on the former Kooragang Island Waste Emplacement Facility site. It is described as a first step towards a separate, larger proposed Clean Energy Precinct. No capital investment is stated.

The proponent's scoping report, dated September 2023, asked for the Secretary's environmental assessment requirements (SEARs), and the SEARs have since been issued. The case is now at the stage where the proponent prepares an environmental impact statement (EIS). No public submissions have been made yet. Next, the EIS is exhibited so the public can make submissions, the proponent responds, and the department assesses the project before it is decided.

Ammonia storage tank
30,000 tonnesPortal page
Disturbance footprint (up to)
32.5 haScoping Report - Infrastructure & Ammonia DA

The department's description

Construction and operation of:

- 30,000 tonne ammonia storage tank

- electrical & water infrastructure

- administration & warehouse buildings

- internal roads & car park.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.