Clarrie Hall Dam Raising
Raising Clarrie Hall Dam by 8.5 m, near Uki
Where it is in the process
Approved on 13 Aug 2026
What it proposes
AI summary. Written from this project's page and its Clarrie Hall Dam Raising SSI Assessment Report and Clarrie Hall Dam Raising SSI Instrument of Approval on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
Raising Clarrie Hall Dam by 8.5 m, near Uki
Tweed Shire Council proposed to raise Clarrie Hall Dam, at 45 Clarrie Hall Dam Road, Uki, in the Tweed Shire area, by about 8.5 m. This lifts the dam's capacity from 16,000 ML to 42,300 ML. The work includes a new spillway, a re-established quarry, haul roads, a concrete batching plant and a replacement of McCabes Bridge. The department gives a capital investment value of $304,000,000. The raised dam would flood about 209 ha more land, and 246.11 ha of vegetation would be lost.
The environmental impact statement was exhibited from 25 Sep 2024 and drew 22 submissions: 15 objecting, 1 supporting and 6 commenting. The proponent responded to submissions on 26 Nov 2025. The department recommended approval, and its Executive Director, acting for the Minister, approved the project on 13 Aug 2026 with conditions. Next, the proponent must meet those conditions before and during construction.
- Capital investment
- $304MClarrie Hall Dam Raising SSI Assessment Report
- Dam wall raising
- 8.5 mClarrie Hall Dam Raising SSI Instrument of Approval
- Dam capacity after raising
- 42,300 MLClarrie Hall Dam Raising SSI Instrument of Approval
- Dam capacity before raising
- 16,000 MLClarrie Hall Dam Raising SSI Instrument of Approval
- Vegetation loss
- 246.11 haClarrie Hall Dam Raising SSI Assessment Report
- Additional inundation area
- 209 haClarrie Hall Dam Raising SSI Assessment Report
- Aboriginal sites impacted
- 11 sitesClarrie Hall Dam Raising SSI Assessment Report
The department's description
Raising Clarrie Hall Dam wall by 8.5m to increase the water storage capacity of the dam to approximately 42,300 ML, and the associated works and infrastructure upgrades required to construct and operate the raised dam.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
22 submissions: 18 from the public and 4 from organisations
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
59 documents in 8 folders, each on the NSW Planning Portal
Notice of Exhibition1
Application1
SEARs4
EIS22
- Appendix A SEARs Compliance Table
- Appendix B Concept Design Report
- Appendix C Statutory Compliance Table
- Appendix D Stakeholder Engagement Report
- Appendix E Mitigation Measures Table
- Appendix F Flood Impact Assessment
- Appendix G1 Surface Water Assessment
- Appendix G2 Groundwater Assessment
- Appendix H Biodiversity Development Assessment Report
- Appendix I Aquatic Ecology Assessment
- Appendix J ACHA Redacted
- Appendix K Historic Heritage
- Appendix L Social Impact Assessment
- Appendix M Land Soils and Erosion Assessment
- Appendix N Preliminary Site Investigation
- Appendix O Climate Change Risk Greenhouse Gas Assessment
- Appendix P Noise and Vibration Impact Assessment
- Appendix Q Air Quality Impact Assessment
- Appendix R Bushfire Assessment
- Appendix S Transport and Traffic Assessment
- EIS Clarrie Hall Dam Raising
- EIS Lodgement_20240919054700
Response to Submissions2
Agency Advice23
- Agency advice - EIS - Crown Lands
- Agency advice - EIS - DCCEEW BCS
- Agency advice - EIS - DCCEEW BCS - MNES
- Agency advice - EIS - DCCEEW Water
- Agency advice - EIS - DPIRD Fisheries
- Agency advice - EIS - EPA
- Agency advice - EIS - HNSW ACH
- Agency advice - EIS - HNSW ACH
- Agency advice - EIS - Heritage NSW
- Agency advice - EIS - NSW RFS
- Agency advice - EIS - NSW SES (ID2699)
- Agency advice - EIS - TfNSW
- Agency advice - EIS - WNSW
- Agency advice - RtS - Crown Lands
- Agency advice - RtS - DCCEEW Water
- Agency advice - RtS - EPA
- Agency advice - RtS - Fisheries
- Agency advice - RtS - HNSW ACH
- Agency advice - RtS - NPWS & CPHR
- Agency advice - RtS - NSW SES (ID3555)
- Agency advice - RtS - RFS
- Agency advice - RtS - TfNSW
- CPHR Rsp Cl Hall Dam MNES Sgn SMN 19-02-2026
Additional Information3
What's near it
Where it is
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.