On the map
State significant development

CLARA Energy Project Rosedale

A green hydrogen plant with a 250 MW solar farm, Mundarlo

Under way: at prepare eisIndustry and warehousesDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its ROS-ARC-RPT-EPA-001-Scoping Report_Draft 6.0 on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A green hydrogen plant with a 250 MW solar farm, Mundarlo

The proponent proposes a green hydrogen production facility at 232 Rosedale Road, Mundarlo, in the Cootamundra-Gundagai Regional Council area, along the Hume Highway. Hydrogen would be made by electrolysers powered by an on-site solar farm with a capacity of 250 MW, producing 25 tonnes a day. The facility would also have hydrogen liquefaction, compression, storage and wholesale distribution, a water treatment plant and a supplementary power supply. The site is about 5366 ha and the project area about 1074 ha. No capital investment or job numbers are stated.

The case is at the stage where the proponent prepares its environmental impact statement (EIS). The scoping report is dated July 2023, and the Secretary's environmental assessment requirements (SEARs) have been issued. Next, the EIS is to be exhibited and the public can make submissions. No submissions have been made so far. The department then assesses the project before a decision.

Solar farm capacity
250 MWROS-ARC-RPT-EPA-001-Scoping Report_Draft 6.0
Hydrogen production
25 tonnes a dayROS-ARC-RPT-EPA-001-Scoping Report_Draft 6.0
Site area
5,366 haROS-ARC-RPT-EPA-001-Scoping Report_Draft 6.0
Project area
1,074 haROS-ARC-RPT-EPA-001-Scoping Report_Draft 6.0

The department's description

Construction and operation of a green hydrogen production facility, comprised of:

- hydrogen production, liquefaction, compression, storage and wholesale distribution

- 250MW solar farm

- water treatment plant

- supplementary power supply

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Where it is

Suburb
Mundarlo
Council area
Cootamundra-Gundagai Regional

Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0

Other State projects near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.