Cement Australia Port Kembla Terminal Upgrade

Upgrade of the Cement Australia terminal, Port Kembla

Under way: at prepare eisIndustry and warehousesDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report - Cement Australia PKT Upgrade -August 2026 on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

Upgrade of the Cement Australia terminal, Port Kembla

Cement Australia proposes to upgrade its existing grinding mill facility at 1 Arawata Drive, Port Kembla, in the Wollongong City area. The upgrade would let the site import and export cementitious materials (cement, slag and fly ash). It would add import and storage, road dispatch, export storage and dispatch by ship, and ship unloading. The facility is approved for 1.4 million tonnes a year, and the capital investment is estimated at $250 million. The proponent says it would replace the Glebe Island facility in Sydney, which is to close by December 2030.

The proponent lodged a scoping report in August 2026 and asked for the Secretary's environmental assessment requirements (SEARs), which have been issued. The proponent is now preparing an environmental impact statement (EIS). Next, the EIS is to be exhibited and the public can make submissions. No submissions have been made yet. The department then assesses the project and decides it.

Capital investment
$250MScoping Report - Cement Australia PKT Upgrade -August 2026
Approved capacity of existing facility
1.4 million tonnes a yearScoping Report - Cement Australia PKT Upgrade -August 2026
Existing facility area
2.5 haScoping Report - Cement Australia PKT Upgrade -August 2026
Lease area
4.5 haScoping Report - Cement Australia PKT Upgrade -August 2026

The department's description

The upgrade of the existing facility will ensure the continued supply of cementitious materials following the closure of the Glebe Island facility.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

3 documents in 2 folders, each on the NSW Planning Portal

Request for SEARs1
SEARs2

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.