Bulloo Interlink Pipeline
A 103 km underground gas pipeline near Tibooburra
Where it is in the process
At exhibition, since 18 Nov 2026
Open for comment until 16 Dec 2026. Anyone can make a submission on its page on the Planning Portal.
What it proposes
AI summary. Written from this project's page and its Bulloo Interlink Pipeline EIS on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A 103 km underground gas pipeline near Tibooburra
The proponent proposes to build, operate and later decommission the NSW section of the Bulloo Interlink Pipeline, a high-pressure underground gas pipeline of about 103 km. It would run from the NSW–Queensland border through remote pastoral land in the Unincorporated Far West, then join the Moomba to Wilton Pipeline about 70 km south-east of Tibooburra. The whole pipeline is about 339 km long, with about 236 km in Queensland, which is approved under a separate process. No capital investment or job numbers are stated.
The environmental impact statement (EIS) is on exhibition from 18 Nov 2026 to 16 Dec 2026, and no submissions are recorded yet. Next, the proponent responds to the submissions, and the department assesses the project with advice from other agencies. The department then reports and a decision is made. The project is critical State significant infrastructure.
- NSW pipeline length
- 103 kmBulloo Interlink Pipeline EIS
- Whole pipeline length
- 339 kmBulloo Interlink Pipeline EIS
- Queensland section length
- 236 kmBulloo Interlink Pipeline EIS
- Distance of tie-in from Tibooburra
- 70 kmBulloo Interlink Pipeline EIS
The department's description
The Bulloo Interlink Pipeline is a 336-kilometre underground, high pressure gas pipeline which would connect the Moomba to Wilton Pipeline in the New South Wales to the South West Queensland Pipeline
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
32 documents in 5 folders, each on the NSW Planning Portal
Notice of Exhibition2
Application1
EIS17
- Bulloo Interlink Pipeline EIS
- EIS Lodgement_20261102053839
- EIS Summary
- Technical Report 01_BDAR (Appendices A-F)
- Technical Report 01_BDAR (Appendices H-K)
- Technical Report 01_BDAR (Appendix G)
- Technical Report 01_BDAR (Main Report)
- Technical Report 02_ACHAR_Public Version
- Technical Report 03_Hazard and Risk
- Technical Report 04_Surface Water
- Technical Report 05_Groundwater
- Technical Report 06_Transport and Traffic
- Technical Report 07_Noise and Vibration
- Technical Report 08_Social
- Technical Report 09_Land use and soils
- Technical Report 10_Air Quality and GHG
- Technical Report 11_Landscape and Visual
What's near it
Where it is
- Suburb
- Tibooburra
- Council area
- Unincorporated NSW
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.