On the map
State significant development

Bulli Seam Operations

Decided: approved on 22 Dec 2011Mining

Where it is in the process

Approved on 22 Dec 2011

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Assessment (done)
  6. Recommendation (done)
  7. Determination22 Dec 2011 (done)
  8. Approved22 Dec 2011

What it proposes

The portal gives no description.

Modifications

7 changes to the project after its decision, each assessed as a case of its own, newest first.

MOD 7 Coal Wash Emplacement Design - Stage 4MP08_0150-Mod-7

Under way: at assessment · 8 submissions

The modification application comprises: • optimised design of the Stage 4 Coal Wash Emplacement Area; • increase of the Coal Wash Emplacement Area landform height from 331m to approximately 357m; • supporting infrastructure upgrades.

Its 22 documents

22 documents in 6 folders, each on the NSW Planning Portal

Early Consultation1

See the document on the Planning Portal

Notice of Exhibition1

See the document on the Planning Portal

Modification Application8

See the 8 documents on the Planning Portal

Response to Submissions2

See the 2 documents on the Planning Portal

Agency Advice8

See the 8 documents on the Planning Portal

Amendments2

See the 2 documents on the Planning Portal

Its page on the Planning Portal

MOD 4 - VAM Abatement ProjectMP08_0150-Mod-4

Decided: approved on 24 Nov 2025 by the department (director) · 5 submissions

Construction and operation of a ventilation air methane (VAM) abatement plant

Its 26 documents

Its page on the Planning Portal

MOD 6 - Blasting LimitsMP08_0150-Mod-6

Decided: approved on 11 Oct 2024 by the department (director)

Increased blasting frequency and extended blasting hours

Its 10 documents

10 documents in 5 folders, each on the NSW Planning Portal

Modification Application1

See the document on the Planning Portal

Agency Advice3

See the 3 documents on the Planning Portal

Additional Information3

See the 3 documents on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

Mod 5 - Coal Wash TransportMP08_0150-Mod-5

Decided: approved on 9 Aug 2024 by the department (director) · 7 submissions

Transport and emplacement of coal wash from the Russell Vale Colliery

Its 19 documents

Its page on the Planning Portal

MOD 3 - Appin Mine Ventilation and Access ProjectMP08_0150-Mod-3

Decided: approved on 12 Apr 2022 by the department (director) · 26 submissions

Two ventilation shafts and mine access at 345 Menangle Road, Menangle, for the Appin Mine, approved by the department on 12 Apr 2022.

The department's description

Installation of mine ventilation and access infrastructure

Its 49 documents

49 documents in 10 folders, each on the NSW Planning Portal

Early Consultation3
Notice of Exhibition1
Preparation of Modification Report1
Modification Application8
Response to Submissions2
Agency Advice15
Additional Information12
Recommendation3
Determination3
Consolidated Consent1

Its page on the Planning Portal

Bulli Seam Operations MOD 2 - Bulli Seam OperationsMP08_0150-Mod-2

Decided: approved on 28 Oct 2016 by the department (director) · 10 submissions

/

Its 8 documents

Its page on the Planning Portal

Bulli Seam Operations MOD 1 - Bulli Seam OperationsMP08_0150-Mod-1

Decided: approved on 2 Apr 2015 by the department (executive director)

/

Its 6 documents

Its page on the Planning Portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.