On the map
State significant development

Bullecourt Avenue, Milperra Stages 4-7

About 328 residential lots at Bullecourt Avenue, Milperra

Under way: at prepare eisHomesDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its SEARs Cover Letter- SSD-109921491 on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

About 328 residential lots at Bullecourt Avenue, Milperra

The proponent proposes to finish the civil works and build homes in stages 3 to 7 of a site at 2 and 2A Bullecourt Avenue, Milperra, in the Canterbury-Bankstown area. The portal describes about 328 residential lots, the construction of dwellings, and alterations and additions to an existing childcare centre. No capital investment is stated.

The case is at the stage where the proponent prepares its environmental impact statement (EIS). The Secretary's environmental assessment requirements (SEARs) were issued on 3 April, and they are valid for 9 months. They require affordable housing on the site, in addition to the contribution under an existing planning agreement, and multi dwelling housing. No rezoning is sought, so the proposal must follow the current Local Environmental Plan. Next, the proponent lodges the EIS, which is then exhibited for public submissions. There are no submissions yet.

Residential lots
328 lotsPortal page

The department's description

Construction of remaining civil works and built form within stages 3 to 7 on the site including creation of approximately 328 residential lots, construction of dwellings, alterations and additions to existing childcare centre.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.