On the map
State significant development

Bullawah Wind Farm

A 141-turbine wind farm southeast of Hay

Decided: approved on 1 Oct 2026Energy: windRegional scale

Where it is in the process

Approved on 1 Oct 2026

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (done)
  7. Recommendation (done)
  8. Determination1 Oct 2026 (done)
  9. Approved1 Oct 2026

What it proposes

AI summary. Written from this project's page and its Development consent and Assessment Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 141-turbine wind farm southeast of Hay

The project is a wind farm of up to 141 turbines, with a nameplate capacity of up to about 804 MW and a maximum tip height of 300 m. It includes a battery of up to 359 MW and 718 MWh and up to three substations. It is about 28 km southeast of Hay, across the Hay, Murrumbidgee and Edward River council areas, and connects to the Project EnergyConnect transmission line. The department's report gives a capital investment of $2 billion, with construction proposed over about three years.

The environmental impact statement (EIS) was exhibited in 2024 and drew 87 submissions: 68 objecting, 17 supporting and 2 commenting. The proponent amended the project in April 2025, removing two turbines. The department assessed it without an overall recommendation. The Independent Planning Commission approved it on 1 Oct 2026, with conditions. Next, the proponent must meet those conditions, including voluntary planning agreements with the councils, before construction.

Wind turbines
141 turbinesAssessment Report
Capacity
804 MWAssessment Report
Maximum turbine tip height
300 mAssessment Report
Battery storage capacity
718 MWhAssessment Report
Battery power capacity
359 MWAssessment Report
Project area
20,629 haAssessment Report
Submissions
87 submissionsPortal page
Submissions objecting
68 submissionsPortal page

The department's description

Construction and operation of a wind farm with up to 141 wind turbines and associated infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

87 submissions: 74 from the public, 10 from organisations and 3 from public authorities

Object68
Support17
Comment2

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

136 documents in 10 folders, each on the NSW Planning Portal

Notice of Exhibition1
Request for SEARs1
SEARs19
EIS20
Response to Submissions14
Agency Advice34
Amendments17
Additional Information25
Recommendation3
Determination2

What's near it

Where it is

Suburb
Carrathool
Council areas
Hay, Murrumbidgee, Edward River

Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0

Other State projects near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.