Bullawah Wind Farm
A 141-turbine wind farm southeast of Hay
Where it is in the process
Approved on 1 Oct 2026
What it proposes
AI summary. Written from this project's page and its Development consent and Assessment Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it
A 141-turbine wind farm southeast of Hay
The project is a wind farm of up to 141 turbines, with a nameplate capacity of up to about 804 MW and a maximum tip height of 300 m. It includes a battery of up to 359 MW and 718 MWh and up to three substations. It is about 28 km southeast of Hay, across the Hay, Murrumbidgee and Edward River council areas, and connects to the Project EnergyConnect transmission line. The department's report gives a capital investment of $2 billion, with construction proposed over about three years.
The environmental impact statement (EIS) was exhibited in 2024 and drew 87 submissions: 68 objecting, 17 supporting and 2 commenting. The proponent amended the project in April 2025, removing two turbines. The department assessed it without an overall recommendation. The Independent Planning Commission approved it on 1 Oct 2026, with conditions. Next, the proponent must meet those conditions, including voluntary planning agreements with the councils, before construction.
- Wind turbines
- 141 turbinesAssessment Report
- Capacity
- 804 MWAssessment Report
- Maximum turbine tip height
- 300 mAssessment Report
- Battery storage capacity
- 718 MWhAssessment Report
- Battery power capacity
- 359 MWAssessment Report
- Project area
- 20,629 haAssessment Report
- Submissions
- 87 submissionsPortal page
- Submissions objecting
- 68 submissionsPortal page
The department's description
Construction and operation of a wind farm with up to 141 wind turbines and associated infrastructure.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
87 submissions: 74 from the public, 10 from organisations and 3 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
136 documents in 10 folders, each on the NSW Planning Portal
Notice of Exhibition1
Request for SEARs1
SEARs19
- Issued SEARs
- SEARs Advice - Airservices
- SEARs Advice - Biodiversity Conservation Division
- SEARs Advice - CASA
- SEARs Advice - Crown Lands
- SEARs Advice - DPE Water
- SEARs Advice - DPI Agriculture
- SEARs Advice - DPI Fisheries
- SEARs Advice - Edward River Council
- SEARs Advice - Environment Protection Authority
- SEARs Advice - Fire and Rescue NSW
- SEARs Advice - Hay Council
- SEARs Advice - Heritage NSW
- SEARs Advice - Heritage NSW - Aboriginal CH
- SEARs Advice - Mining Exploration and Geoscience
- SEARs Advice - Murrumbidgee Council
- SEARs Advice - Rural Fire Service
- SEARs Advice - Transport for NSW
- Supplementary SEARs
EIS20
- Appendix 10 - Noise and Vibration Assessment
- Appendix 11 - Social Impact Assessment
- Appendix 12 - Traffic Impact Assessment
- Appendix 13 - Water Resources Impact Assessment
- Appendix 14 - Soil Land and Agriculture Impact Assessment
- Appendix 15 - Air Quality Assessment
- Appendix 16 - Preliminary Hazard Analysis
- Appendix 17 - Bush Fire Hazard Assessment
- Appendix 18 - Telecommunications Impact Assessment
- Appendix 19 - Human Health Assessment (EMF)
- Appendix 20 - Blade Throw Assessment
- Appendix 21 - Aviation Impact Assessment
- Appendix 22 - Economic Impact Assessment
- Appendix 23 - Cumulative Impact Scoping Summary
- Appendix 6 - BDAR - Part A (Main Body)
- Appendix 6 - BDAR - Part B (Appendices)
- Appendix 7 - Aboriginal Cultural Heritage Assessment
- Appendix 8 - Historical Heritage Impact Assessment
- Appendix 9 - Landscape and Visual Impact Assessment
- Environmental Impact Statement
Response to Submissions14
- Appendix 1 - Submissions Register
- Appendix 10 - Revised HHIA
- Appendix 11 - Revised ACHAR
- Appendix 12 - TWA LUC Risk Assessment
- Appendix 2 - Updated Statutory Compliance Table
- Appendix 3 - Updated Mitigations Measures
- Appendix 4 - Revised Preliminary Hazard Analysis
- Appendix 5 - NVIA Addendum
- Appendix 6 - LVIA Addendum
- Appendix 7 - Revised Aviation Impact Assessment
- Appendix 8 - Aviation Impact Assessment Addendum
- Appendix 9 - Obstacle Lighting Plan
- Request RTS Letter
- Submissions Report
Agency Advice34
- Advice on EIS - AirServices Australia
- Advice on EIS - BCS
- Advice on EIS - CASA
- Advice on EIS - Crown Lands
- Advice on EIS - DCCEEW Water
- Advice on EIS - DPIRD land use
- Advice on EIS - EPA
- Advice on EIS - Fire and Rescue
- Advice on EIS - Fisheries
- Advice on EIS - Heritage Council
- Advice on EIS - Heritage NSW
- Advice on EIS - Local Land Services
- Advice on EIS - MEG
- Advice on EIS - NPWS
- Advice on EIS - RFS
- Advice on EIS - Telco Authority
- Advice on EIS - TfNSW
- Advice on EIS - Water NSW
- Advice on RTS / Amendment - CPHR
- Advice on RTS / Amendment - Heritage Council
- Advice on RTS / Amendment - MEG
- Advice on RTS and Amendment - ERC
- Advice on RTS/ Amendment - CASA
- Advice on RTS/Amendment - Crown Lands
- Advice on RTS/Amendment - DCCEEW Water
- Advice on RTS/Amendment - FRNSW
- Advice on RTS/Amendment - HNSW ACH
- Advice on RTS/Amendment - NPWS
- Advice on RTS/Amendment - NSW EPA
- Advice on RTS/Amendment - NSWR
- Advice on RTS/Amendment - RFS
- Advice on RTS/Amendment - TfNSW
- Advice on RTS/Amendment - WaterNSW
- FINAL IEAPET Bullawah wind farm advice
Amendments17
- Acceptance of Amended Application
- Amendment Report Main Body
- Appendix 1 - Amended Project Description
- Appendix 10 - Addendum Economic Impact Assessment
- Appendix 11 - Amended Blade Throw Assessment
- Appendix 12 - Amended Obstacle Lighting Plan
- Appendix 2 - Project Design Information
- Appendix 3- Updated Mitigations Measures
- Appendix 4 - Summary of Bio Offsets
- Appendix 5 - Amended BDAR (Part A) - Main Body
- Appendix 5 - Amended BDAR (Part B) - Appendix A-H
- Appendix 5 - Amended BDAR (Part C) - Appendix I
- Appendix 5 - Amended BDAR (Part D) - Appendix J-L
- Appendix 6 - Addendum ACHAR
- Appendix 7 - Noise Sensitivity Analysis
- Appendix 8 - Addendum Social Impact Assessment
- Appendix 9 - Amended Traffic Impact Assessment
Additional Information25
- Request for Additional Information No 1 (24 April 2025)
- Request for Additional Information No 2 (23 June 2025) RFI 2 and Agency Advice combined
- Request for Additional Information No 3 (22 Oct 2025)
- Request for Additional Information No 4 (4 March 2026)
- Response to RFI 2
- Response to RFI 3 Edward River VPA
- Response to RFI 3 Hay Shire VPA
- Response to RFI 3 Murrumbidgee VPA
- Response to RFI No 1 - Attachment 1 Comments on Access Rights
- Response to RFI No 1 - Attachment 2 Preliminary Site Investigation
- Response to RFI No 1 - Attachment 3 Contamination Assessment – Port to Hay
- Response to RFI No 1 - Attachment 4 Updated Mitigations Measures
- Response to RFI No 1 - Covering Letter
- Response to RFI No. 4 Road upgrades and Strategic designs
- Response to RfI 2 Amended BDAR Part A (Main Body)
- Response to RfI 2 Amended BDAR Part B (Appendices A-H)
- Response to RfI 2 Amended BDAR Part C (Appendix I - Detailed Figure Set)
- Response to RfI 2 Amended BDAR Part D (Appendices J-L)
- Response to RfI 2 Amended Traffic Impact Assessment
- Response to RfI 2 Appendix B - RevisedACHAR
- Response to RfI 2 Appendix C - Revised Addendum ACHAR
- Response to RfI 2 Appendix E - Consolidated Concept Design Package
- Response to RfI 2 Appendix F - Amended Project Description
- Response to RfI 2 Appendix G - Updated Project Mitigation Measures
- Response to RfI 2 Bullawah Wind Farm Independent review of SAII
Recommendation3
Determination2
What's near it
Where it is
- Suburb
- Carrathool
- Council areas
- Hay, Murrumbidgee, Edward River
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.