On the map
State significant infrastructure

Broken Hill Reverse Osmosis Plant

Broken Hill drought water supply bore field and plant

Withdrawn: withdrawnMixed useLocal scale

Where it is in the process

Withdrawn

  1. Prepare Scoping Report (to come)
  2. SEARs (to come)
  3. Prepare EIS (to come)
  4. Exhibition (to come)
  5. Collate Submissions (to come)
  6. Response to Submissions (to come)
  7. Assessment (to come)
  8. Recommendation (to come)
  9. Determination (to come)
  10. Withdrawn

What it proposes

AI summary. Written from this project's page and its Broken Hill Drought Water Supply Final SEARs 2015010... on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

Broken Hill drought water supply bore field and plant

The proponent, Water NSW, proposed the Broken Hill Drought Water Supply on land next to Menindee Lakes, in the Central Darling Shire. It would include building and running a bore field, a reverse osmosis plant and disposal basins. No capital investment, water capacity, site size or job numbers are stated.

The Secretary's environmental assessment requirements (SEARs) were issued on 5 Jan 2015. They set out what the environmental impact statement (EIS) had to cover, including water, Aboriginal and historic heritage, contamination, ecology, noise, traffic, hazards and bushfire. A preliminary environmental assessment was lodged. No submissions were received. The application was later withdrawn, so it was never decided. The portal gives no date or reason for the withdrawal.

The portal gives no description.

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Where it is

Suburb
Menindee
Council area
Central Darling

Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.