On the map
State significant development

Bondo Wind Farm

Bondo Wind Farm: up to 149 turbines east of Tumut

Under way: at prepare eisEnergy: windDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

Bondo Wind Farm: up to 149 turbines east of Tumut

Neoen seeks to build the Bondo Wind Farm in and around the Bondo State Forest, about 20 km east of Tumut, across the Snowy Valleys, Cootamundra-Gundagai Regional and Yass Valley council areas. It proposes up to 149 wind turbines with a generation capacity of about 1.2 GW, plus two battery energy storage systems, each of 400 MW / 1600 MWh. The project area covers 41,883 ha, though the area actually disturbed would be smaller. No capital investment or job numbers are stated.

The case is at the stage of amending the Secretary's environmental assessment requirements (SEARs), which set what the proponent's environmental impact statement (EIS) must cover. A scoping report dated June 2025 supports the request, and the SEARs and a supplementary set have been issued. No submissions have been made. Next, the proponent prepares the EIS, which is then exhibited so the public can make submissions.

Wind turbines
149 turbinesScoping Report
Wind generation capacity
1.2 GWScoping Report
Capacity of each battery
400 MWScoping Report
Storage of each battery
1,600 MWhScoping Report
Project area
41,883 haScoping Report

The department's description

Neoen seeks to construct up to 149 wind turbine generators (WTGs), with an electricity generation capacity of

approximately 1.2 gigawatts (GW). Along with two BESS infrastructure both with a capacity of 400 MW / 1600 MWh.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Where it is

Suburb
Argalong
Council areas
Snowy Valleys, Cootamundra-Gundagai Regional, Yass Valley

Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0

Other State projects near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.