State significant development

Boags Creek Solar Farm

A 300 MW solar farm and battery near Darlington Point

Under way: at prepare eisEnergy: batteriesDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 300 MW solar farm and battery near Darlington Point

The proponent proposes a 300 MW solar farm with an integrated battery energy storage system of 300 MW / 600 MWh at 7346 Kidman Way, Darlington Point, in the Murrumbidgee Council area. The project area is 845 ha, about 8 kilometres south of Darlington Point. It includes solar panels, inverters, transformers, overhead lines, underground cabling, a site office and a substation. The scoping report expects about 350 full-time equivalent jobs at the peak of construction and about five permanent jobs in operation, and gives a capital investment of more than $30 million.

The case is at the stage where the proponent prepares its environmental impact statement (EIS). The Secretary's environmental assessment requirements (SEARs) were issued and amended on 3 Jul 2026, after advice from agencies. Next, the EIS is exhibited and the public can make submissions. No submissions have been made yet. The department then assesses the project and decides it, or refers it to the Independent Planning Commission.

Solar farm capacity
300 MWScoping Report
Battery power capacity
300 MWScoping Report
Battery storage capacity
600 MWhScoping Report
Project area
845 haScoping Report
Peak construction jobs
350 jobsScoping Report
Operational jobs
5 jobsScoping Report

The department's description

The development of a 300 MW solar farm, energy storage facility and associated infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 19 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.