On the map
State significant development

Bettergrow Resource Recovery Facility Wetherill Park

Decided: approved on 22 Dec 2017Waste

Where it is in the process

Approved on 22 Dec 2017

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (done)
  7. Recommendation (done)
  8. Determination22 Dec 2017 (done)
  9. Approved22 Dec 2017

What it proposes

The department's description

A resource recovery facility to process up to 160,000 tonnes per annum of waste and a landscaping material supplies facility for the storage and sale of up to 40,000 tonnes per annum of landscaping supplies.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

8 submissions: 8 from organisations

Object0
Support0
Comment8

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Modifications

4 changes to the project after its decision, each assessed as a case of its own, newest first.

Bettergrow RRF Wetherill Park MOD 4 - Admin changeSSD-7401-Mod-4

Decided: approved on 25 Jan 2024 by the department (team leader)

Administrative amendment to reflect additional waste streams of concrete slurry and stormwater, assessed as appropriate in Modification 1, in the limits of consent

Its 6 documents

6 documents in 4 folders, each on the NSW Planning Portal

Modification Application1

See the document on the Planning Portal

Additional Information2

See the 2 documents on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

Bettergrow RRF Wetherill Park MOD 3 - CarparkingSSD-7401-Mod-3

Decided: approved on 1 Apr 2022 by the department (team leader)

Replacement of the five approved weighbridges with one centrally located weighbridge, re-configuration of onsite parking, relocation of the proposed Humeceptor and relocation of a 5,000 L rainwater tank to inside drill muds processing shed.

Its 9 documents

9 documents in 5 folders, each on the NSW Planning Portal

Modification Application1

See the document on the Planning Portal

Agency Advice2

See the 2 documents on the Planning Portal

Additional Information2

See the 2 documents on the Planning Portal

Determination3

See the 3 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

Bettergrow RRF Wetherill Park MOD 2 - StormwaterSSD-7401-Mod-2

Decided: approved on 30 Nov 2021 by the department (team leader)

Replace the 30, 000 L sediment basin and bioretention basin in the southwest corner of the site with an inground pit and sand filter located under the hardstand on the lower level of the site.

Its 12 documents

12 documents in 5 folders, each on the NSW Planning Portal

Modification Application1

See the document on the Planning Portal

Agency Advice2

See the 2 documents on the Planning Portal

Additional Information5

See the 5 documents on the Planning Portal

Determination3

See the 3 documents on the Planning Portal

Consolidated Consent1

See the document on the Planning Portal

Its page on the Planning Portal

Bettergrow RRF Wetherill Park MOD 1 - CapacitySSD-7401-Mod-1

Decided: approved on 21 Apr 2021 by the department (director) · 10 submissions

Increase the processing capacity to 350,000 tpa of waste, introduce additional waste streams, demolish existing structures, construct a partially enclosed shed and increase the hours of operation to 24/7.

Its 30 documents

Its page on the Planning Portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.