Beaches Link and Gore Hill Freeway Connection
Where it is in the process
Withdrawn
What it proposes
The department's description
Twin tolled motorway tunnels connecting the Warringah Freeway at Cammeray and the Gore Hill Freeway at Artarmon to the Burnt Bridge Creek Deviation at Balgowlah and the Wakehurst Parkway at Seaforth.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
1,549 submissions: 1,441 from the public, 94 from organisations and 14 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
103 documents in 9 folders, each on the NSW Planning Portal
Notice of Exhibition1
Application1
EIS55
- -BL EIS Part 2 - Executive summary to Chapter 4
- -BL EIS Part 3 - Chapter 5 (1)
- -BL EIS Part 4 - Chapters 6 to 7
- -BL EIS Part 5 - Chapters 8 to 10
- -BL EIS Part 7 - Chapters 14 to 18
- -BL EIS Part 8 - Chapters 19 to 21
- -BL EIS Part 9 - Chapter 22
- -BL EIS Part1-Contents, certification and glossary
- -Chapter 0 Executive summary
- -Chapter 1 Introduction
- -Chapter 12 Air quality
- -Chapter 14 Non-Aboriginal heritage
- -Chapter 15 Aboriginal cultural heritage
- -Chapter 16 Geology, soils and groundwater
- -Chapter 17 Hydrodynamics and water quality
- -Chapter 18 Flooding
- -Chapter 19 Biodiversity
- -Chapter 2 Assessment process
- -Chapter 21 Socio-economics
- -Chapter 23 Hazard and risks
- -Chapter 24 Resource use and waste management
- -Chapter 25 Sustainability
- -Chapter 26 Climate change risk and greenhouse gas
- -Chapter 27 Cumulative impacts
- -Chapter 28 Synthesis of the EIS
- -Chapter 29 References
- -Chapter 3 Strategic context and project need
- -Chapter 4 Project development and alternatives
- -Chapter 5 Project description
- -Chapter 9 Operational traffic and transport
- -Contents, certification and glossary
- App A SEARs checklist
- App B EPA Regulation 2000 (NSW) checklist
- App C Environmental risk analysis
- App D Utilities management strategy
- App E Community consultation framework
- App G Noise and vibration - Part 3
- App H Air quality - Part 2
- App I Health impact assessment
- App J Non-Aboriginal heritage
- App K Maritime heritage
- App L Aboriginal cultural heritage
- App M Contamination
- App N Groundwater
- App P Hydrodynamic and dredge plume modelling
- App Q Marine water quality
- App R Flooding (Part 1)
- App R Flooding (Part 2)
- App S Biodiversity Development Assessment Report
- App U Socio-economic assessment
- App V UDLCVIA
- App W Arboricultural impact assessment - Part 1
- App W Arboricultural impact assessment - Part 2
- App X Climate change and greenhouse gas
- App Y Environmental management measures
Response to Submissions18
- Request for preparation of RTS letter 11 March 2021
- Response to Submissions (RtS) Table of contents and glossary
- RtS Appendix A Aboriginal cultural heritage sites
- RtS Appendix B Parking impact assessment
- RtS Appendix C Sediment and marine water quality memos
- RtS Appendix D Groundwater modelling uncertainty analysis
- RtS Appendix E Predicted groundwater drawdown
- RtS Appendix F (Part 1) Further information on biodiversity
- RtS Appendix F (Part 2) Further information on biodiversity
- RtS Appendix G Additional flood mapping
- RtS Appendix H Non-Aboriginal heritage assessment
- RtS Appendix I Noise insulation program
- RtS Appendix J Construction noise strategy
- RtS Executive summary
- RtS Part A Introduction and overview
- RtS Part B Response to key stakeholder submissions
- RtS Part C Response to community submissions
- RtS Part D Revised environmental management measures
Additional Information6
Amendments12
- Addendum to PIR Section 9 – Dredged material
- PIR Appendix A Middle Harbour ecological modelling
- PIR Appendix B Operational traffic modelling report
- PIR AppendixC Revised EMM - new cover page
- PIR Executive summary - new cover page
- PIR Section 3 Spit West Reserve support site (BL9)
- PIR Section 4 Effects of the immersed tube tunnel
- PIR Section 6 Road intersection performance
- PIR Section 8 References
- PIR Section5 Material unsuitable - new cover page
- Preferred Infrastructure Report (PIR) Table of contents and glossary
- letter to DPIE_Addendum to PIR
What's near it
Where it is
- Suburb
- Cammeray
- Council areas
- North Sydney, Northern Beaches, Willoughby, Lane Cove, Mosman
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category: Bowerbird's, from the register's development type, in five levels from minor to regional. Its stage is the portal's on the day it was read.