Bayswater Power Station Coal Unloader

Decided: decided on 3 Nov 2005Energy: other

Where it is in the process

At determination, since 3 Nov 2005

  1. Prepare Scoping Report (done)
  2. SEARs (done)
  3. Prepare EIS (done)
  4. Exhibition (done)
  5. Collate Submissions (done)
  6. Response to Submissions (done)
  7. Assessment (done)
  8. Recommendation (done)
  9. Determination3 Nov 2005 (current stage)

What it proposes

The portal gives no description.

Modifications

1 change to the project after its decision, each assessed as a case of its own, newest first.

Mod 1 - Administrative ChangeDA50-3-2005-Mod-1

Decided: approved by the department (executive director)

Its page on the Planning Portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

8 documents in 2 folders, each on the NSW Planning Portal

Determination2

See the 2 documents on the Planning Portal

Reports6

See the 6 documents on the Planning Portal

What's near it

Its point is approximate (the register's own, to about a kilometre), and so are these.

Where it is

Suburb
Sugarloaf
Council area
Muswellbrook

Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0

Other State projects near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 17 Nov 2026. See it on the map · Every State project

Category: Bowerbird's, from the register's development type, in five levels from minor to regional. Its stage is the portal's on the day it was read.