State significant development

Baulkham Hills Battery Energy Storage System

A 43 MW battery at Old Windsor Road, Old Toongabbie

Under way: at response to submissionsEnergy: batteriesDistrict scale

Where it is in the process

At response to submissions

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (current stage)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Baulkham Hills BESS EIS on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 43 MW battery at Old Windsor Road, Old Toongabbie

The proponent proposes a battery energy storage system of up to 43 MW and 170 MWh at 191Z Old Windsor Road, Old Toongabbie, in the City of Parramatta. It would use 30 lithium-ion battery containers beside the existing Baulkham Hills substation, with noise walls five and six metres high. The development footprint is about 0.4 ha and the estimated cost is about $75 million. Construction would take about 15 months, with up to 40 workers at peak.

The environmental impact statement (EIS) has been exhibited and drew 5 submissions: 3 supporting and 2 commenting. The proponent is at the response to submissions stage, and the portal gives no date for it. Next, the department assesses the project with advice from other agencies and then makes a recommendation. The Minister or the Minister's delegate decides it.

Capital investment
$75MBaulkham Hills BESS EIS
Battery power capacity
43 MWPortal page
Battery storage capacity
170 MWhPortal page
Battery containers
30 containersPortal page
Development footprint
0.4 haBaulkham Hills BESS EIS
Construction period
15 monthsBaulkham Hills BESS EIS
Peak construction workforce
40 full-time equivalent workersBaulkham Hills BESS EIS

The department's description

Construction and operation of a high voltage (HV) Battery Energy Storage System (BESS) comprising of 30 lithium-ion battery containers with a capacity of up to 43 megawatts (MW)/170 megawatt hours (MWh) and associated infrastructure.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

5 submissions: 3 from the public, 1 from organisations and 1 from public authorities

Object0
Support3
Comment2

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

48 documents in 5 folders, each on the NSW Planning Portal

Request for SEARs2
SEARs4
EIS22
Response to Submissions1
Agency Advice19

What's near it