On the map
State significant development

Aussie Skips Recycling - Bellfrog St Site upgrades

Upgrade of the Bellfrog Street waste facility, Greenacre

Under way: at assessmentWasteNeighbourhood scale

Where it is in the process

At assessment

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (current stage)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its Aussie Recycling Greenacre EIS V3.0 FINAL_signed on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

Upgrade of the Bellfrog Street waste facility, Greenacre

Aussie Skips Recycling Pty Ltd proposes to upgrade its existing waste facility at 13 Bellfrog Street, Greenacre, in the Strathfield council area, into a resource recovery facility. It would add a fixed material recovery plant, a waste receival building and a waste processing building, joined by an enclosed conveyor, with all waste handled under cover. The environmental impact statement (EIS) says it would process up to 199,000 tonnes a year, the same as the current licence, and staff would rise from about 5.25 to 13 full-time roles. The portal's description gives 250,000 tonnes a year. No capital investment is stated.

The EIS is dated 3 Nov 2025. The portal shows 8 submissions: 4 objecting, 2 supporting and 2 commenting. The department has asked the proponent for more information several times and is assessing the project. Next, it prepares an assessment report and the project is decided.

Annual waste throughput in the EIS
199,000 tonnes a yearAussie Recycling Greenacre EIS V3.0 FINAL_signed
Throughput in the portal description
250,000 tonnes a yearPortal page
Staff on site after upgrade
13 full-time rolesAussie Recycling Greenacre EIS V3.0 FINAL_signed
Fire-water containment capacity
844 kLAussie Recycling Greenacre EIS V3.0 FINAL_signed

The department's description

To increase the capacity of the Bellfrog Street site to receive and process up to 250,000 tonnes of general solid waste per annum

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

8 submissions: 5 from the public, 2 from organisations and 1 from public authorities

Object4
Support2
Comment2

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

75 documents in 8 folders, each on the NSW Planning Portal

Early Consultation11
Notice of Exhibition1
Request for SEARs1
SEARs3
EIS23
Response to Submissions3
Agency Advice27
Additional Information6

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.