Under way: at prepare eisHomesDistrict scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its SSD-82484458 Scoping Report on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

Redeveloping Anglicare seniors housing at Castle Hill

Anglicare proposes a staged redevelopment of its seniors housing site at 284 Castle Hill Road and 146-200 David Road, Castle Hill, in Hornsby Shire. The application seeks a concept master plan and a detailed Stage 1 application. It includes approximately 595 independent living units, two residential care facilities with 105 beds in total, 10,500 m² of health and wellness amenities and 5 ha of landscaped open space. The overall site is approximately 43.5 ha. The scoping report says the work would be staged over 15 to 20 years. No capital investment is stated.

The case is at the stage where the proponent prepares an environmental impact statement (EIS). The scoping report is dated March 2025, and the Secretary's environmental assessment requirements (SEARs) have been issued and later amended. No submissions have been made yet. Next, the EIS is exhibited and the public can make submissions. The proponent then responds, and the department assesses the project.

Independent living units
595 dwellingsSSD-82484458 Scoping Report
Residential care beds
105 bedsSSD-82484458 Scoping Report
Health and wellness amenities floor area
10,500 m²SSD-82484458 Scoping Report
Landscaped open space
5 haSSD-82484458 Scoping Report
Overall site area
43.5 haSSD-82484458 Scoping Report

The department's description

Concept and stage one application for redevelopment of existing seniors housing.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.