Alterations and additions to Kincoppal-Rose Bay School
Where it is in the process
Approved on 14 Oct 2021
What it proposes
The department's description
Concept development application and Stage 1 detailed development proposal for alterations and additions to Kincoppal-Rose Bay School including a staged increase in student numbers to a maximum of 1,205 students over a 10-year timeframe.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
8 submissions: 8 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Modifications
2 changes to the project after its decision, each assessed as a case of its own, newest first.
Kincoppal-Rose Bay School - Modification 2SSD-10325-Mod-2
Amend the student capacity outlined in Conditions A9 and C6 to vary the distribution of student groups to reflect a maximum of 100 ELC students and a maximum of 1,105 primary or senior students.
Its 10 documents
10 documents in 3 folders, each on the NSW Planning Portal
Modification Application5
Additional Information3
Determination2
Kincoppal-Rose Bay School Mod 1 - New StairsSSD-10325-Mod-1
Inclusion of stairs to improve access and circulation
Its 8 documents
8 documents in 3 folders, each on the NSW Planning Portal
Modification Application5
Determination2
Consolidated Consent1
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
83 documents in 11 folders, each on the NSW Planning Portal
Early Consultation3
Notice of Exhibition1
Request for SEARs1
EIS33
- Appendix A - SEARs
- Appendix AA - Historical Archaeology Assessment
- Appendix B - Cost Report
- Appendix BB - Remediation Action Plan
- Appendix C - Architectural Plans - Year 8 Centre
- Appendix C - Architectural Plans_1
- Appendix C - Architectural Plans_3
- Appendix C - Architectural Plans_4
- Appendix CC - Preliminary Site Investigation
- Appendix D - Site Plans
- Appendix E - Architectural Design Report
- Appendix EE - Solar Access Study
- Appendix F - Civil Plans
- Appendix FF - Sediment and Erosion Control Plans
- Appendix G - Landscape Plans
- Appendix H - ACHAR
- Appendix I - Acoustic Report
- Appendix J - Arborist Report
- Appendix K - BDAR Waiver
- Appendix L - Community Consultation Report July
- Appendix M - Community Consultation Report Oct
- Appendix N - Civil Engineering Report
- Appendix P - Geotechnical Report (Bus Parking)
- Appendix Q - Geotechnical Report
- Appendix R - TIA
- Appendix S - ESD Report
- Appendix T - Heritage Impact Statement
- Appendix U - Conservation Managament Plan
- Appendix V - Operational Waste Management Plan
- Appendix W - Electrical Infrastructure Mgmt Plan
- Appendix X - Construction Management Plan
- Appendix Y - Infrastructure Management Plan
- Appendix Z - Structural Report
Response to Submissions29
- Appendix B Updated Mitigation Measures
- Appendix D1 Concept Architectural Plans
- Appendix D2 Concept Architectural Plans
- Appendix D3 Concept Architectural Plans
- Appendix D4 Concept Architectural Plans
- Appendix E1 Revised Detailed Architectural Plans
- Appendix E2 Revised Detailed Architectural Plans
- Appendix E3 Revised Detailed Architectural Plans
- Appendix E4 Revised Detailed Architectural Plans
- Appendix F Revised Design Report (July 2021)
- Appendix G Concept Landscape Plans (May 2021)
- Appendix H Detailed Landscape Plans (May 2021)
- Appendix I Addendum Transport Impact Assessment
- Appendix J Revised Civil Drawings 01
- Appendix J Revised Civil Drawings 02
- Appendix K Addendum Civil Engineering Report
- Appendix L Preliminary Soils Assessment
- Appendix M1 Revised Geotechnical Report
- Appendix M2 Revised Geotechnical Report
- Appendix M3 Revised Geotechnical Report
- Appendix N ESD Report (June 2020)
- Appendix O Revised Stage 1 Contamination Report
- Appendix P Revised RAP (May 2021)
- Appendix Q Addendum Aboriginal Heritage Statement
- Appendix R Addendum Acoustic Statement (May 2021)
- Appendix S Revised Construction Management Plan
- Appendix T Addendum Heritage Statement (July 2021)
- Request RTS_01022021_030743
- Submissions Report (July 2021)
Agency Advice2
Additional Information3
Determination5
Management Plans and Strategies4
Notifications1
What's near it
Where it is
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category: Bowerbird's, from the register's development type, in five levels from minor to regional. Its stage is the portal's on the day it was read.