6-12 Head Street, Forster

A 10-storey, 157-room hotel at Head Street, Forster

Under way: at prepare eisTourism and recreationNeighbourhood scale

Where it is in the process

At prepare eis

  1. SEARs (done)
  2. Prepare EIS (current stage)
  3. Exhibition (to come)
  4. Collate Submissions (to come)
  5. Response to Submissions (to come)
  6. Assessment (to come)
  7. Recommendation (to come)
  8. Determination (to come)

What it proposes

AI summary. Written from this project's page and its SCOPING REPORT 6 -12 HEAD ST FORSTER on the NSW Planning Portal, on 19 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 10-storey, 157-room hotel at Head Street, Forster

The proponent proposes to demolish the existing Golden Sands Hotel and a two-storey residential building at 6-12 Head Street, Forster, in the Mid-Coast Council area. In their place it would build a 10-storey hotel above two basement levels, with about 157 guest rooms, a ballroom and conference rooms, a pool, a gym and a restaurant. The building would be about 40.1 m high, against a 33 m limit in the local plan. It would have about 173 car spaces on a site of about 3,385 m². The estimated cost is about $130 million.

The proponent has asked for the Secretary's environmental assessment requirements (SEARs), and the portal lists SEARs as issued. The case is at the stage where the proponent prepares an environmental impact statement (EIS). The EIS would then be exhibited and the public could make submissions. No submissions have been made so far. The department would then assess the proposal and decide it.

Estimated development cost
$130MSCOPING REPORT 6 -12 HEAD ST FORSTER
Hotel guest rooms
157 roomsSCOPING REPORT 6 -12 HEAD ST FORSTER
Building height
10 storeysSCOPING REPORT 6 -12 HEAD ST FORSTER
Maximum building height
40.1 mSCOPING REPORT 6 -12 HEAD ST FORSTER
Local plan height limit
33 mSCOPING REPORT 6 -12 HEAD ST FORSTER
Car parking spaces
173 car spacesSCOPING REPORT 6 -12 HEAD ST FORSTER
Site area
3,385 m²SCOPING REPORT 6 -12 HEAD ST FORSTER

The department's description

Demolition of the existing development and construction of a 10-storey hotel comprising approximately 157 guest rooms, with associated conference, hospitality, recreation and wellness facilities, basement parking, servicing and landscaping.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.