Approved on 15 Sep 2023
What it proposes
The department's description
Construction and operation of a Data Centre with a total power consumption of 400 MW including demolition, bulk earthworks, associated infrastructure and services, landscaping and car parking.
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0
Submissions
What the public, organisations and public authorities said, counted by where they stood.
2 submissions: 1 from organisations and 1 from public authorities
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal
Modifications
3 changes to the project after its decision, each assessed as a case of its own, newest first.
51 Huntingwood Drive Data Centre Modification 3SSD-41589232-Mod-3
Modifications to bulk and scale of the development including deletion of data halls, gantries, removal of 6 floor level to Building 2, amended footprint of the chiller farm gantry.
Modification 1 51 Huntingwood Drive Data Centre - Reduced ScaleSSD-41589232-Mod-1
Modification to reduce the maximum building height from 49.75 m to 45.21 m and a reduction in building footprint from 242,110 sqm to 220,060 sqm, increased gantry area, increase in southern substation yard, water tanks yards and car parking.
Its 48 documents
48 documents in 3 folders, each on the NSW Planning Portal
Modification Application4
Agency Advice12
Additional Information32
51 Huntingwood Drive Data Centre MOD 2 - Design UpdatesSSD-41589232-Mod-2
Consolidate the approved data centre from 10 to 5 shells, reduce GFA from 122,546 m² to 64,346 m², relocation of mechanical plant to ground level, and refine generator testing arrangements.
Its 22 documents
22 documents in 3 folders, each on the NSW Planning Portal
Modification Application14
- Appendix B1 - Architectural Plans
- Appendix B10 - Biodiversity Verification Statement
- Appendix B11 - BCA and Access Report
- Appendix B12 - Fire Safety Report
- Appendix B13 - Arborist Report
- Appendix B14 - Integrated Water Cycle Management Plan
- Appendix B2 - Landscape Plans
- Appendix B3 - Visual Impact Assessment
- Appendix B4 - Noise and Vibration Assessment
- Appendix B5 - Air Quality Impact Assessment
- Appendix B6 - Traffic Impact Assessment
- Appendix B8 - Hazards and Risk Report
- Appendix B9 - Infrastructure Requirements Report
- SSD-41589232 - MOD 2 - Modification Report
Agency Advice6
- DCA Advice - 51 Huntingwood Data Centre Mod 2
- EPA response - Mod 2 Huntingwood Data Centre - 13.08.26
- EPA response - Mod 2 Huntingwood Data Centre - 29.06.26
- Letter Out - 51 Huntingwood Drive DC MOD 2 -Mod Report -
- Response letter to DPHI - MOD-26-00253
- WTJ25-427 - Response to DPHI - 51 Huntingwood Drive
Documents
By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.
101 documents in 11 folders, each on the NSW Planning Portal
Notice of Exhibition1
Request for SEARs2
SEARs2
EIS38
- Appendix 1 - DCP Compliance Table
- Appendix 10 - Infrastructure Requirements Report
- Appendix 11 - Geotechnical Report & Addendum
- Appendix 12 - Acid Sulfate Soil Management Plan
- Appendix 13 - Salinity Assessment Report
- Appendix 14 - Salinity Management Plan
- Appendix 15 - Contamination Investigation
- Appendix 16 - Remedial Action Plan
- Appendix 17 - HAZMAT Management Survey and Register
- Appendix 18 - Traffic and Parking Impact Assessment
- Appendix 19 - Construction Traffic Management Plan
- Appendix 20 - Green Travel Plan
- Appendix 21 - Arboricultural Impact & Tree Protection Plan
- Appendix 22 - Biodiversity Development Assessment Report
- Appendix 23 - Aquatic and Riparian Ecosystem Assessment
- Appendix 24 - Air Quality Impact Assessment
- Appendix 25 - Acoustic Assessment Report
- Appendix 26 - Statement of Heritage Impact
- Appendix 27 - Archaeological Report_1of2
- Appendix 27 - Archaeological Report_2of2
- Appendix 28 - Aboriginal Cultural Heritage Assessment
- Appendix 29 - Ecologically Sustainable Development Report
- Appendix 3 - SEARs Report
- Appendix 30 - Waste Management Plan
- Appendix 31 - Resilience and Hazards SEPP Report
- Appendix 32 - BCA Capability Statement
- Appendix 33 - Access Design Review
- Appendix 34 - Fire Engineering Statement of Support
- Appendix 35 - Engagement Report
- Appendix 36 - Socio-Economic Impact Assessment Report
- Appendix 4 - Survey Plan
- Appendix 5 - Architectural Drawings
- Appendix 6 - Architectural Design Report
- Appendix 7 - Landscape Plans
- Appendix 8 - Visual Impact Assessment
- Appendix 9 - IWCMP and Civil Engineering Drawings
- Environmental Impact Statement 51 Huntingwood Drive
- MUSIC Modelling
Response to Submissions19
- Acoustic - Cover Letter
- Acoustic Report - RTS
- Additional Matters for Submissions Report
- Air Quality - RTS
- Architectural Design Report - RTS
- Architectural Schedule of Changes - RTS
- Architectural Set - RTS
- Biodiversity Development Assessment Report - RTS - 09.05.23
- Civil - Cover Letter
- Civil IWCMP Report (Appendix A) - RTS
- Civil IWCMP Report (Appendix C) - RTS
- Civil IWCMP Report - RTS
- Hazards and Risks - RTS
- Landscape Plan - RTS
- Landscape Plan and VIA - Cover Letter
- Planning Submissions Report - RTS
- Request RTS Letter_EXH-53635456
- Survey Plan
- Visual Impact Assessment - RTS
Agency Advice16
- 20230526 - TfNSW Response SYD23_00067_02 SSD-41589232
- 51 Huntingwood Drive Data Centre (SSD-41589232)
- 51 Huntingwood Drive Data Centre - Response Letter
- BCC Response to RTS
- BCC response to Huntingwood Data Centre
- EHG Comments - 51 Huntingwood Drive Data Centre
- EHG Comments - 51 Huntingwood Drive Data Centre
- EHG RTS letter SSD (41589232) 51 Huntingwood Drive
- EPA - further information required
- EPA recommended conditions
- HSW ACH EIS (SSD-41589232)
- Letter out - Huntingwood Drive Data Centre - RTS
- RFI Request for Comment on Agency Advice
- SWC Response - 51 Huntingwood Data Centre
- TfNSW Response SYD23_00067_01 SSD-41589232
- WaterNSW Response SSD-41589232 Huntingwood Data Centre EIS
Determination6
Management Plans and Strategies14
- 51 Huntingwood Drive, Huntingwood_Staging Letter
- Approval of CEMP
- Approval of Plan Strategy or Study
- Approval of Plan Strategy or Study
- Approval of Stage 2 Management Plans Letter SSD-41589232
- Approval of Staging of Plans and Strategies
- B36 - Erosion & Sediment Control Plans
- B46 - Biodiversity Management Plan
- Construction Noise & Vibration Management Plan - Stage 2
- Construction Traffic Management Plan - Stage 2
- Demoltion & Construction Waste Management
- Erosion & Sediment Control Plan - Stage 2
- SUPERSEDED Construction Traffic Management Plan Rev F04
- UPDATED EROSION & SEDIMENT CONTROL PLAN
Reports1
Other Documents1
What's near it
Where it is
- Suburb
- Huntingwood
- Council area
- Blacktown
Source ABS suburbs and localities and local government areas (ASGS 2021), CC BY 4.0
Other State projects near it
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0; straight-line distance
Nearest schools
Source NSW Department of Education, CC BY; straight-line distance
Nearest hospitals
Source AIHW MyHospitals, CC BY 4.0; straight-line distance
Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project
Category: Bowerbird's, from the register's development type, in five levels from minor to regional. Its stage is the portal's on the day it was read.