On the map
State significant development

43-61 Turner Road Data Centre

A 53 MW data centre at 43-61 Turner Road, Gregory Hills

Decided: approved on 21 Nov 2025Data centresDistrict scale

Where it is in the process

Approved on 21 Nov 2025

  1. SEARs (done)
  2. Prepare EIS (done)
  3. Exhibition (done)
  4. Collate Submissions (done)
  5. Response to Submissions (done)
  6. Assessment (done)
  7. Recommendation (done)
  8. Determination21 Nov 2025 (done)
  9. Approved21 Nov 2025

What it proposes

AI summary. Written from this project's page and its Signed - Determination Instrument and Signed SSD-SSI Assessment Report on the NSW Planning Portal, on 18 Nov 2026. It can be wrong or out of date: check the documents before relying on it. Report a problem with it

A 53 MW data centre at 43-61 Turner Road, Gregory Hills

The project is a two-storey data centre at 43-61 Turner Road, Gregory Hills, in the Camden area, on a vacant industrial site of 9.74 ha. It has 12 data halls, a gross floor area of 14,941 m² and a maximum height of 23 m. Power consumption is 61.7 MW (53 MW IT load). It includes back-up diesel generators, lithium-ion batteries and a substation. The estimated cost is $800 million, with up to 100 construction jobs and 50 operational jobs.

The environmental impact statement (EIS) was exhibited from 5 Mar 2025 to 1 Apr 2025 and drew 6 submissions: 3 objecting and 3 commenting. The department's assessment report of November 2025 found it approvable subject to conditions. A director of the department, acting for the Minister, approved it on 21 Nov 2025. Next, the proponent must meet the conditions before and during construction.

Capital investment
$800MSigned SSD-SSI Assessment Report
Power consumption
61.7 MWSigned SSD-SSI Assessment Report
Construction jobs
100 jobsSigned SSD-SSI Assessment Report
Operational jobs
50 jobsSigned SSD-SSI Assessment Report
Gross floor area
14,941 m²Signed SSD-SSI Assessment Report
Maximum building height
23 mSigned SSD-SSI Assessment Report
Site area
9.74 haSigned SSD-SSI Assessment Report

The department's description

Construction and operation of data centre with a power consumption capacity of 53 megawatts (MW), 20 back-up diesel generators, lithium-ion batteries and associated operational equipment, substation, driveway access, parking and landscaping.

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0

Submissions

What the public, organisations and public authorities said, counted by where they stood.

6 submissions: 4 from the public, 1 from organisations and 1 from public authorities

Object3
Support0
Comment3

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: counted by position and by who made them; their text and names stay on the portal

Modifications

1 change to the project after its decision, each assessed as a case of its own, newest first.

Modification 1 - Substation layout changesSSD-68013714-Mod-1

Decided: approved on 26 Jun 2026 by the department (team leader)

Modifications to onsite substation building to accommodate additional electrical equipment, widening of the substation access road and relocating the MV (switchgear) building to enhance internal traffic flow and facilitate emergency vehicle access.

Its 4 documents

4 documents in 3 folders, each on the NSW Planning Portal

Modification Application1

See the document on the Planning Portal

Agency Advice1

See the document on the Planning Portal

Determination2

See the 2 documents on the Planning Portal

Its page on the Planning Portal

Documents

By folder, as the Planning Portal files them. Each opens the portal's own copy: the proponent's documents are theirs, and Bowerbird keeps none.

78 documents in 12 folders, each on the NSW Planning Portal

Early Consultation1
Notice of Exhibition1
Request for SEARs1
SEARs2
EIS35
Response to Submissions3
Agency Advice17
Additional Information3
Determination6
Management Plans and Strategies4
Reports4
Notifications1

What's near it

Source NSW Planning Portal Major Projects (DPHI), CC BY 4.0: the project's page, read 18 Nov 2026. See it on the map · Every State project

Category and scale: Bowerbird's, from the register's development type and the figures it states, in five levels from minor to regional. Its stage is the portal's on the day it was read.